Budget No.: 16112024
📅 Date: 16/11/2024
*This quotation is valid for 3 months.
👇 DOWNLOAD IN PDF
Mr. & Mrs. Plemp.pdf8992.4KB
💡 OBJECTIVE
Replacing the existing hedge, which is old and diseased, with a new hedge.
Replacing the existing soil in the planter along the car park ramp.
💰 COST ESTIMATION
➜ ➜ ➜ Scroll if you are on mobile to see the whole table ➜ ➜ ➜
CONCEPT | QUANTITY | €PRICE | €TOTAL |
1️⃣ Eliminate existing plants, with the removal of plant debris to the authorised landfill. | 1 | 220 | 220 |
2️⃣ Excavate the existing soil to a depth of approximately 40 cm to replace it with new topsoil for planting. Removal of the debris to an authorised landfill site. | 1 | 2110 | 2110 |
3️⃣ Supply and planting of new Eugenia plants. Approximate plant size: 60 cm high in 10 l pot. | 72 | 32 | 2304 |
4️⃣ Adaptation of the drip irrigation system to water the new plants in a convenient way. | 1 | 140 | 140 |
TOTAL BUDGET = €4774
(Prices excl. VAT)
PAYMENT METHOD
- 60% of the total upon acceptance of the quote.
- The remaining 40% upon completion of the budgeted works.
- Prices excluding VAT
Hoping that our offer will be to your liking, kind regards.
Fernando Rivero
Do you want to accept the budget?
Thank you very much!