DETAILS
1️⃣
Cost estimation item 1
➜ ➜ ➜ Scroll if you are on mobile to see the whole table ➜ ➜ ➜
CONCEPT | QUANTITY | €PRICE | €TOTAL |
1️⃣ | |||
2️⃣ | |||
3️⃣ | 1 | ||
4️⃣ |
Total point 1 = €
(Prices excl. VAT)
2️⃣
Cost estimation item 2
➜ ➜ ➜ Scroll if you are on mobile to see the whole table ➜ ➜ ➜
CONCEPT | QUANTITY | €PRICE | €TOTAL |
1️⃣ | |||
2️⃣ | |||
3️⃣ | 1 | ||
4️⃣ |
Total point 2 = €
(Prices excl. VAT)
3️⃣
Cost estimation item 3
➜ ➜ ➜ Scroll if you are on mobile to see the whole table ➜ ➜ ➜
CONCEPT | QUANTITY | €PRICE | €TOTAL |
1️⃣ | |||
2️⃣ | |||
3️⃣ | 1 | ||
4️⃣ |
Total point 3 = €
(Prices excl. VAT)
4️⃣
Cost estimation item 4
➜ ➜ ➜ Scroll if you are on mobile to see the whole table ➜ ➜ ➜
CONCEPT | QUANTITY | €PRICE | €TOTAL |
1️⃣ | |||
2️⃣ | |||
3️⃣ | 1 | ||
4️⃣ |
Total point 4 = €
(Prices excl. VAT)
5️⃣
Cost estimation item 5
➜ ➜ ➜ Scroll if you are on mobile to see the whole table ➜ ➜ ➜
CONCEPT | QUANTITY | €PRICE | €TOTAL |
1️⃣ | |||
2️⃣ | |||
3️⃣ | 1 | ||
4️⃣ |
Total point 5 = €
(Prices excl. VAT)
DETAILS
1️⃣ Entrance
🅰 Supply and planting of a shrub composition in the entrance flower bed to the garage.
Includes:
- Clearing and preparation of the site
- Supply and planting of plants with topsoil.
🅱 Supply and installation of a planter for culinary herbs and planting of a lime tree.
Includes:
- Clearing and preparation of the site
- Supply and assembly of a planter for culinary herbs using ecological wooden railway sleepers placed on a single level to create a rectangle measuring approximately 2x1.40 m.
- Backfill the planter with topsoil.
- Supply and planting of a lime tree.
- Laying of the gravel extracted from the parking area on special anti-weed sheeting.
- Maintain the existing succulent plants.
🅲 Supply and planting of 1 orange tree (summer or winter) and laying of gravel.
Includes:
- Clearing and preparation of the site.
- Supply and planting of 1 orange tree (summer or winter).
- Laying of gravel extracted from the parking area on a special anti-weed sheet.
- Existing succulent plants are maintained.
🅳 Supply and planting of 1 orange tree (summer or winter).
Includes:
- Clearing and preparation of the site.
- Supply and planting of 1 orange tree (summer or winter).
🅴 Supply and planting of 3 cypress trees to cover the view in the future.
Includes:
- Clearing and preparation of land.
- Supply and planting with topsoil of 3 Leylandii cypresses approximately 3.5 m high.
- Removal of existing Pittosporum shrub.
🅵 Supply and planting of 3 oleander trees to cover the gap while maintaining the existing shrubbery.
Includes:
- Clearing and preparation of land.
- Supply and planting with topsoil of 3 Oleander 18 litre pot size. Soft pink flower colour.
- Maintain existing Pittosporum shrub.
🅶 Use some of the stones from the photo on the left to rebuild the top corner in the photo on the right.
Includes:
- Clearing and preparation of ground.
- Removing stones and placing them in their new position.
🅷 Installation of a drip irrigation system to conveniently water the plants listed in this budget item.
Includes:
- Supply and installation of a drip irrigation system connected to the installation already carried out by the builder, and which we are awaiting an explanation from him as to where we can make the connection.
- Only the supply and installation of the drip pipes is included, we assume that all the previous installation has already been done by the builder.
Cost estimation item 1
➜ ➜ ➜ Scroll if you are on mobile to see the whole table ➜ ➜ ➜
CONCEPT | QUANTITY | €PRICE | €TOTAL |
🅰 Supply and planting of a shrub composition in the entrance flower bed to the garage. | |||
🅱 Supply and installation of a planter for culinary herbs and planting of a lime tree. | |||
🅲 Supply and planting of 1 orange tree (summer or winter) and laying of gravel. | |||
🅳 Supply and planting of 1 orange tree (summer or winter). | |||
🅴 Supply and planting of 3 cypress trees to cover the view in the future. | |||
🅵 Supply and planting of 3 oleander trees to cover the gap while maintaining the existing shrubbery. | |||
🅶 Use some of the stones from the photo on the left to rebuild the top corner in the photo on the right. | |||
🅷 Installation of a drip irrigation system to conveniently water the plants listed in this budget item. |
Total point 1 = €
(Prices excl. VAT)
2️⃣ Petanque Zone
🅰 Supply and installation of Petanca.
Includes:
- Supply and installation of a petanque based on Ecological wooden railway sleepers, measuring approximately 11 metres by 2.5 metres, as shown in the image. Using a single line of train timbers anchored to the ground with rods and plates.
- Filled with earth called stoneware to make the surface playing base of the petanque.
- Extraction of the existing gravel in the parking area and placement in this area on a special anti-weed sheet.
- The gravel will only go as far as the petanque, as we have proposed that the rest of the esplanade should be covered with a printed concrete base, as will be done in the car park area, which will be done by the company that will do the paving in the car park area.
🅱 Plant more bougainvillea in the wall to fill in the gaps.
Includes:
- Supply and planting of 6 bougainvillea with composted topsoil.
🅲 Climbing plants on the wall.
Includes:
- Supply and planting of 7 jasmine climbing plants in the planter with topsoil fertilised.
🅳 Installation of a drip irrigation system to conveniently water the plants listed in this budget item.
Includes:
- Supply and installation of a drip irrigation system connected to the installation already carried out by the builder, and which we are awaiting an explanation from him as to where we can make the connection.
- Only the supply and installation of the drip pipes is included, we assume that all the previous installation has already been done by the builder.
Cost estimation item 2
➜ ➜ ➜ Scroll if you are on mobile to see the whole table ➜ ➜ ➜
CONCEPT | QUANTITY | €PRICE | €TOTAL |
🅰 Supply and installation of Petanca. | |||
🅱 Plant more bougainvillea in the wall to fill in the gaps. | |||
🅲 Climbing plants on the wall. | |||
🅳 Installation of a drip irrigation system to conveniently water the plants listed in this budget item. |
Total point 2 = €
(Prices excl. VAT)
3️⃣ Central Zone
🅰 Old staircase rockery.
Includes:
- Supply and planting of 3 singular plants with composted topsoil.
- Supply and planting of 17 medium sized plants with compost.
- Removal of dead plant, small olive tree and 2 old fruit trees.
🅱 Main rockery.
Includes:
- Supply and planting of 2 more Strelitzia to make a composition of three units taking advantage of the existing one, with composted topsoil.
- Supply and planting of 70 small plants with compost.
- Supply and planting of 5 medium sized plants with compost.
🅲 Wall area.
Includes:
- Supply and planting of 14 Bouganvilleas with composted topsoil.
- Supply and planting of 5 light pink flowering Oleanders with compost.
- Supply and planting of 3 cypresses with a height of approximately 3 m. with compost and 2 wooden supports to hold them in place for the first year.
🅳 Installation of a drip irrigation system to conveniently water the plants listed in this budget item.
Includes:
- Supply and installation of a drip irrigation system connected to the installation already carried out by the builder, and which we are awaiting an explanation from him as to where we can make the connection.
- Only the supply and installation of the drip pipes is included, we assume that all the previous installation has already been done by the builder.
Cost estimation item 3
➜ ➜ ➜ Scroll if you are on mobile to see the whole table ➜ ➜ ➜
CONCEPT | QUANTITY | €PRICE | €TOTAL |
🅰 Old staircase rockery. | |||
🅱 Main rockery. | |||
🅲 Wall area. | |||
🅳 Installation of a drip irrigation system to conveniently water the plants listed in this budget item. |
Total point 3 = €
(Prices excl. VAT)
4️⃣ Lawn area
We are going to work on the design in the lawn area to create some decorative gravel areas and plants. And some variety of hardy grass for the ping-pong and step area. We will also include a stone slab pathway connecting the two main wooden staircases.
Cost estimation item 4
➜ ➜ ➜ Scroll if you are on mobile to see the whole table ➜ ➜ ➜
CONCEPT | QUANTITY | €PRICE | €TOTAL |
1️⃣ | |||
2️⃣ | |||
3️⃣ | 1 | ||
4️⃣ |
Total point 4 = €
(Prices excl. VAT)
5️⃣ Swimming pool area
🅰 Small corner rockery.
🅱 Main pool rockery.
🅲 Fence with neighbour.
🅳 Hole in pool hedge.
🅴 Tennis court fence.
Cost estimation item 5
➜ ➜ ➜ Scroll if you are on mobile to see the whole table ➜ ➜ ➜
CONCEPT | QUANTITY | €PRICE | €TOTAL |
🅰 Small corner rockery. | |||
🅱 Main pool rockery. | |||
🅲 Fence with neighbour. | |||
🅳 Hole in pool hedge. | |||
🅴 Tennis court fence. |
Total point 5 = €
(Prices excl. VAT)